Weatherproof Outdoor Sauna Pod with Black Frame CSA-215

Weatherproof Outdoor Sauna Pod with Black Frame CSA-215 product view
CSauna product reference image for RFQ review.
CSA-215 / Outdoor sauna

Specifications and options for CSA-215

Use CSA-215 as the visual reference, then confirm capacity, size, heater voltage, wood finish, glass direction, MOQ, packing, and document needs before quotation.

Model / SKU CSA-215
Product type Outdoor sauna
Use setting Outdoor
MOQ 1 set
Quotation basis Selected configuration, heater route, destination, packing, and project requirements confirmed before quotation
Reference CSauna factory catalog record
Confirmation items Dimensions, packing, material details, and order drawings are confirmed before production.

Buyer spec snapshotCSA-215 quote checks
Regional voltageElectrical configuration is confirmed with the selected heater and destination market; the approved drawing records the applicable voltage, phase, plug, and control route.
Heater powerHeater capacity is confirmed from room volume, insulation, heater route, and destination electrical standard.
MOQ / sampleSample, mixed-container, and repeat-order scope is quoted after the model, destination, and packing requirements are reviewed.
Wood / glue / coatingWood species and finish to confirm; sauna adhesive and oil, stain, carbonized, or black finish samples confirmed before production
Packing / CBMCarton or crate, CBM, labels, manuals, spare parts, and loading photos confirmed before shipment
Market documentsApplicable component certificates, labels, manuals, and inspection records are reviewed by project and destination.

Use CSA-215 as the visual model reference. Final size, bench layout, heater, glass, voltage, packing, and document route are locked after the approved drawing.

Known vs. confirm before production

Recorded for review Model title, model code, MOQ reference, price band, product type, and image set.
Confirm with buyer Final dimensions, material grade, heater option, glass/door direction, packing size, loading plan, labels, accessories, and destination requirements.
Approval step CSauna confirms the final drawing, quotation, packing details, and order record before production starts.

RFQ checklist for this model

  • Target quantity and whether this is sample, distributor, or project order.
  • Preferred size, wood/finish, heater type, voltage, and control option.
  • Destination port or delivery country for freight and compliance review.
  • Packaging, logo/private label, spare parts, and document requirements.
  • Any site drawing, showroom reference, or installation constraint.

Send us this model code

CSA-215 | bennett@csauna.com | WhatsApp / Phone: +86 180 7047 6405

Email CSauna

Buyer-file detail

CSA-215 production, packing, and RFQ checks

CSA-215 should be treated as a design-led outdoor pod, so shell shape, black frame, roof, glass, and site access need a clear file.

The buyer should confirm whether the pod is for a private garden, spa retreat, resort deck, showroom display, or commercial landscape.

Black frame finish should be photographed under daylight because scratches, tone variation, and edge details are visible on dark frames.

Pod shell sections and frame parts should be numbered or photographed so installation teams can identify assembly order.

If electric heat is selected, heater kW, controller, voltage, stones, guard, and certificate route should be matched to pod volume.

If stove heat is selected, chimney exit, shield, roof penetration, warnings, and local installer responsibility should be handled separately.

Factory QC should show pod shell, black frame, roof pack, bench layout, glass or door crate, heater or stove package, and carton labels.

The quote should separate pod shell, black frame, roof, heat package, glass or door, packing, project documents, and spare parts.

Site access should be discussed before production because pod crates may need forklift, pallet jack, crane, or special unloading space.

Repeat orders should lock shell shape, frame finish, roof material, heat route, glass side, label language, and carton sequence.

Final buyer confirmation

Final approval for CSA-215 should include pod size, black-frame finish, roof package, heat route, glass or door side, crate size, and unloading note.

Packing evidence should show shell sections, frame parts, roof pack, glass or door crate, heat package, labels, and spare hardware.

If site access is limited, crate weight and unloading responsibility should be confirmed before production.

Outdoor maintenance guidance should include frame finish care, roof inspection, drying after use, and lower-frame checks.

The service file should include frame parts, heater or stove references, glass or door hardware, labels, and fasteners.

Repeat production should match the approved black-frame finish and pod shell file.

The final quote should state local electrical, stove, foundation, and unloading responsibilities clearly.


Production record

CSA-215 should keep pod shell sequence, black-frame finish, roof package, glass or door side, heat route, crate size, unloading note, and spare frame parts in one project file.

Before repeat loading, CSauna should compare black-frame tone, shell sections, roof pack, bench layout, glass crate, heater or stove package, labels, and hardware bags.

Request quote for CSA-215