
Specifications and options for CSA-216
Use CSA-216 as the visual reference, then confirm capacity, size, heater voltage, wood finish, glass direction, MOQ, packing, and document needs before quotation.
| Model / SKU | CSA-216 |
|---|---|
| Product type | Outdoor sauna |
| Use setting | Outdoor |
| Wood / finish | Solid wood construction; species and finish confirmed from project requirements |
| MOQ | 1 set |
| Quotation basis | Selected configuration, heater route, destination, packing, and project requirements confirmed before quotation |
| Reference | CSauna factory catalog record |
| Confirmation items | Dimensions, packing, material details, and order drawings are confirmed before production. |
Use CSA-216 as the visual model reference. Final size, bench layout, heater, glass, voltage, packing, and document route are locked after the approved drawing.
Known vs. confirm before production
| Recorded for review | Model title, model code, MOQ reference, price band, product type, and image set. |
|---|---|
| Confirm with buyer | Final dimensions, material grade, heater option, glass/door direction, packing size, loading plan, labels, accessories, and destination requirements. |
| Approval step | CSauna confirms the final drawing, quotation, packing details, and order record before production starts. |
RFQ checklist for this model
- Target quantity and whether this is sample, distributor, or project order.
- Preferred size, wood/finish, heater type, voltage, and control option.
- Destination port or delivery country for freight and compliance review.
- Packaging, logo/private label, spare parts, and document requirements.
- Any site drawing, showroom reference, or installation constraint.
Model views for buyer review






Send us this model code
CSA-216 | bennett@csauna.com | WhatsApp / Phone: +86 180 7047 6405
Buyer-file detail
CSA-216 production, packing, and RFQ checks
CSA-216 should define heavy-duty shell expectations through board thickness, band set, roof cover, exterior finish, and crate planning.
LED lighting should be treated as an electrical and after-sales item, not just a decorative product phrase.
The buyer should approve LED position, color, power route, replacement part, and controller grouping if lighting is integrated.
Barrel board sequence, band set, bench support, lower-frame exposure, and roof cover should be checked with the heavy-duty shell claim.
If electric heat is selected, heater kW, voltage, controller, sensor, stones, guard, LED power, and certificate route should be named.
If stove heat is selected, chimney route, shield, roof exit, warning labels, and local installer responsibility should be stated separately.
Factory QC should show board package, band set, LED test, heater or stove package, roof cover, bench layout, door or glass crate, and labels.
The quotation should split heavy-duty shell, LED parts, roof cover, heat package, packing, labels, documents, and spare hardware.
Outdoor care should mention band tension, roof inspection, LED protection, drying after use, and first-season board movement.
Repeat orders should lock board package, LED component, heat route, roof material, label language, and carton sequence.
Final buyer confirmation
Final approval for CSA-216 should include shell specification, LED position, heating route, voltage or stove scope, roof cover, band set, and carton marks.
QC evidence should show LED power test and heater or stove package before packing.
If LED components change, manual notes, spare parts, and warranty card should be updated.
Packing should protect LED parts separately from heavy boards and metal bands.
The service file should include LED part, controller or transformer, heater or stove references, bands, roof cover, and fasteners.
Repeat production should compare shell package and LED tone against the approved sample.
The final quote should separate shell, lighting, heat, packing, and local responsibility.
Production record
CSA-216 should keep heavy-duty shell and LED lighting records together, including board package, band set, LED color, lighting power route, heat package, roof cover, and spare LED parts.
Before repeat loading, CSauna should compare LED test photos, shell boards, band package, roof cover, heater or stove carton, door or glass crate, and carton sequence.