Specifications and options for CSA-48
Use CSA-48 as the visual reference, then confirm capacity, size, heater voltage, wood finish, glass direction, MOQ, packing, and document needs before quotation.
| Model | CSA-48 |
|---|---|
| Type | Barrel sauna |
| Use setting | Outdoor |
| Capacity | 6 person |
| Wood / finish | Project wood species options |
| Heater | Electric heater option |
| Glass | Door and glass layout matched to model |
Use CSA-48 as the visual model reference. Final size, bench layout, heater, glass, voltage, packing, and document route are locked after the approved drawing.
Product views
Send us this model code
CSA-48 | bennett@csauna.com | WhatsApp / Phone: +86 180 7047 6405
Buyer-file detail
CSA-48 production, packing, and RFQ checks
The design team checks these points before the drawing is locked. They decide whether the buyer receives a repeatable model or only a good-looking sample.
- red finish sample
- electric heater label
- barrel band tension
- roof cover
- touch-up route
CSA-48 should treat the red exterior as a finish decision rather than a material claim.
The buyer should confirm whether the red surface is paint, stain, or another coating route before the quotation is accepted.
Electric heater route should be clearer than usual because the title already separates this model from wood-fired barrels.
For Europe and Southeast Asia, 220-240 V or 380-415 V planning should be named with heater kW and controller language.
For North America, 240 V planning and local electrician responsibility should be visible in the buyer file.
Red finish inspection should include close-up photos after cleaning because marks and scratches are easy to notice.
Packing should protect red panels, heater carton, stones, controller, roof cover, labels, manuals, and small hardware separately.
Outdoor care should mention finish touch-up, roof shingle inspection, barrel band tension, door seal, and heater maintenance.
The RFQ should include base wood, red finish tolerance, voltage market, heater preference, roof color, sample quantity, and carton marks.
A dealer sample should freeze finish color, heater model, roof route, manual language, and packaging file before repeat orders.
CSA-48 should be a clean electric-heated barrel reference, not a repeated outdoor barrel page with a red color word.
Factory evidence should include red surface, heater label, barrel bands, roof edge, bench, and packed carton marks.
Buyer-file detail
CSA-48 additional production checks
CSA-48 should include a red-finish approval note so buyers know the exterior color is a controlled production choice, not a random photo tone.
The buyer should confirm whether red finish is selected for branding, garden visibility, resort style, or private-label differentiation.
Electric heater packages should list heater model, kW, voltage, controller, stones, guard, manual language, and destination certificate request.
If a buyer asks for a stove version, the page should not silently reuse the electric-heater order file.
Packing should protect red panels from strap marks, heater stones, metal hardware, and dirty carton contact.
The maintenance file should mention finish touch-up, roof shingle care, door seal, barrel band tension, and heater inspection.
The RFQ should include base wood, red color tolerance, voltage market, sample quantity, roof color, and carton mark requirements.
CSA-48 should help buyers separate appearance, electrical route, and packing route before price negotiation.