Outdoor Panoramic Sauna Room with Fixed Glass Wall CSA-239

Outdoor Panoramic Sauna Room with Fixed Glass Wall CSA-239 product view
CSauna product reference image for RFQ review.
CSA-239 / Commercial sauna

Model details to confirm

Use CSA-239 as the visual reference, then confirm capacity, size, heater voltage, wood finish, glass direction, MOQ, packing, and document needs before quotation.

Model / SKU CSA-239
Product type Outdoor sauna cabin
Use setting Outdoor
Wood / finish Solid wood construction; species and finish confirmed from project requirements
Heater Steam heater route; voltage and power confirmed by room volume
Glass / door Large glass front; door direction confirmed by drawing
MOQ 1 set
Reference price $1,900-2,200 / set
Reference CSauna factory catalog record
Confirmation items Dimensions, packing, material details, and order drawings are confirmed before production.

Buyer spec snapshotCSA-239 quote checks
Regional voltageUS/Canada, EU/UK, Southeast Asia, Oceania, and 380-415V three-phase routes reviewed by market
Heater power9-18 kW or multi-heater planning after volume review
MOQ / sampleSample, mixed-container, and repeat-order scope reviewed before quote
Wood / glue / coatingSolid wood construction; species and finish confirmed from project requirements; sauna adhesive and oil, stain, carbonized, or black finish samples confirmed before production
Packing / CBMCarton or crate, CBM, labels, manuals, spare parts, and loading photos confirmed before shipment
Market documentsCE, ETL, SAA, label, manual, and inspection file route reviewed by project and destination

Use CSA-239 as the visual model reference. Final size, bench layout, heater, glass, voltage, packing, and document route are locked after the approved drawing.

Known vs. confirm before production

Recorded for review Model title, model code, MOQ reference, price band, product type, and image set.
Confirm with buyer Final dimensions, material grade, heater option, glass/door direction, packing size, loading plan, labels, accessories, and destination requirements.
Approval step CSauna confirms the final drawing, quotation, packing details, and order record before production starts.

RFQ checklist for this model

  • Target quantity and whether this is sample, distributor, or project order.
  • Preferred size, wood/finish, heater type, voltage, and control option.
  • Destination port or delivery country for freight and compliance review.
  • Packaging, logo/private label, spare parts, and document requirements.
  • Any site drawing, showroom reference, or installation constraint.

Send us this model code

CSA-239 | bennett@csauna.com | WhatsApp / Phone: +86 180 7047 6405

Email CSauna

Product specification notes

CSA-239 factory review points

Model role Outdoor panoramic sauna room with fixed glass wall for resorts, lake houses, premium garden projects, and architectural dealer showrooms.
Material check Fixed glass wall, frame finish, exterior panels, roof protection, bench layout, base contact, seal detail, and glass crate should be checked.
Voltage / heat route Heat route should define electric heater or stove preparation, kW or stove scope, controller or chimney path, guard clearance, ventilation, voltage or local approval.
Packing scope Wall panels, fixed-glass crate, roof parts, bench set, heater or stove package, controller or chimney parts, labels, manual, and spare hardware should be separated.
Certification notes Files should include glass specification, wood or exterior panel note, heater or stove support, warning labels, QC photos, carton marks, and destination responsibility.
RFQ direction RFQ should include glass-wall size, view direction, frame color, heat route, voltage or chimney scope, site access, MOQ, packing method, and project location.

Buyer-file detail

CSA-239 production, packing, and RFQ checks

CSA-239 should be treated as a panoramic glass project, so view direction and glass logistics are core specification items.

The buyer should confirm whether the fixed glass wall faces lake, mountain, garden, pool, resort path, or showroom front.

Glass thickness, frame finish, seal detail, crate protection, and replacement glass reference should be approved before production.

Bench layout should align with the view while preserving heater guard clearance and service access.

Heat route must be chosen before cutting because controller, cable, vent, or chimney paths affect wall panels.

Factory QC should show fixed-glass crate, frame detail, wall panels, roof pack, bench layout, heat package, labels, and carton marks.

The quote should separate shell, fixed glass wall, roof, heat package, packing, certificate support, labels, and spare parts.

If the buyer changes glass direction, CSauna should revise panel sequence, crate plan, bench layout, and loading notes.

Repeat production should lock glass specification, frame finish, view side, heat route, roof material, labels, and packing sequence.

The page should make panoramic glass risk and design value clear for premium project buyers.

Final buyer confirmation

Final approval should include glass-wall size, frame finish, view direction, heat route, roof protection, crate method, and carton marks.

Glass crate photos should stay in the buyer file because fixed glass is the main visual and shipping risk.

For resort or lake-house projects, maintenance and guest-safety notes should be attached.

If site access is tight, unloading method and crate dimensions should be confirmed before production.

Spare seals, frame parts, labels, fasteners, and glass replacement references should be listed.

Repeat loading should compare fixed-glass direction and frame finish against the approved file.

Production record

For CSA-239, the fixed glass wall should be approved by direction, frame finish, seal detail, crate method, and replacement glass reference before production.

The project file should connect view direction with bench layout, heater wall, cable or chimney route, roof protection, and site unloading method.

If the buyer changes the panoramic side, panel sequence, crate size, installation note, and carton marks should be updated before loading.