
Specifications and options for CSA-371
Use CSA-371 as the visual reference, then confirm capacity, size, heater voltage, wood finish, glass direction, MOQ, packing, and document needs before quotation.
| Model / SKU | CSA-371 |
|---|---|
| Product type | Outdoor sauna |
| Use setting | Outdoor |
| Wood / finish | Solid wood construction; species and finish confirmed from project requirements |
| MOQ | 1 set |
| Reference price | $1,690-1,890 / set |
| Reference | CSauna factory catalog record |
| Confirmation items | Dimensions, packing, material details, and order drawings are confirmed before production. |
Use CSA-371 as the visual model reference. Final size, bench layout, heater, glass, voltage, packing, and document route are locked after the approved drawing.
Known vs. confirm before production
| Recorded for review | Model title, model code, MOQ reference, price band, product type, and image set. |
|---|---|
| Confirm with buyer | Final dimensions, material grade, heater option, glass/door direction, packing size, loading plan, labels, accessories, and destination requirements. |
| Approval step | CSauna confirms the final drawing, quotation, packing details, and order record before production starts. |
RFQ checklist for this model
- Target quantity and whether this is sample, distributor, or project order.
- Preferred size, wood/finish, heater type, voltage, and control option.
- Destination port or delivery country for freight and compliance review.
- Packaging, logo/private label, spare parts, and document requirements.
- Any site drawing, showroom reference, or installation constraint.
Model views for buyer review






Send us this model code
CSA-371 | bennett@csauna.com | WhatsApp / Phone: +86 180 7047 6405
Production confirmation
What CSauna checks before CSA-371 is quoted
CSA-371 should be judged by ventilation and outdoor protection, not by a broad weatherproof claim.
Vent position affects drying, heater performance, user comfort, and after-use maintenance.
The buyer should approve roof direction and vent trim before panels are finished.
Weatherproof wording should be tied to roof, base, exterior coating, and maintenance expectations.
CSauna should photograph vent trim, heater label, controller, glass protection, roof pack, and crate marks.
If the sauna is used in a humid resort area, airflow and floor drying notes should be clearer than a backyard sample.
The quote should separate structure, ventilation, heater, controller, glass, roof, packing, documents, and spare parts.
This page should help buyers ask for airflow and roof details before price discussion.
Final buyer confirmation
Final approval should include ventilation position, roof route, exterior finish, heater kW, voltage, glass direction, bench layout, and crate size.
MOQ can begin with one sample room, while dealer batches should keep vent trim, label, and spare-parts files consistent.
After-sales records should name vent parts, roof trim, door hardware, heater, stones, controller, sensor, bench boards, and labels.
Final order file
CSA-371 buyer approval details
- Before CSA-371 is released, ventilation position, roof route, heater label, controller position, glass direction, and crate marks should be checked together.
- The buyer should approve whether the vent is mainly for drying, heat balance, or project maintenance, because each route changes trim and service notes.
- After-sales records should name vent parts, roof trim, door hardware, heater, stones, controller, sensor, bench boards, and warning labels.
Design department notes
CSA-371 checks before drawing confirmation
These notes connect the selected model to the real order file: material direction, voltage or heater route, MOQ, packing, labels, certification, inspection evidence, and buyer handoff are confirmed before production.
| Ventilated outdoor room | Confirm air inlet, exhaust side, heater clearance, door gap, roof exposure, and whether the buyer expects natural ventilation or a more controlled project specification. |
|---|---|
| Weatherproof details | Check anti-corrosion finish, floor support, voltage route, heater kW, controller access, lighting, glass direction, and packing protection for outdoor shipment. |
| Order file | Send final footprint, ventilation requirement, destination climate, MOQ, packing method, labels, manuals, certificate path, and inspection-photo checklist. |