
Specifications and options for CSA-199
Use CSA-199 as the visual reference, then confirm capacity, size, heater voltage, wood finish, glass direction, MOQ, packing, and document needs before quotation.
| Model / SKU | CSA-199 |
|---|---|
| Product type | Outdoor sauna cabin |
| Use setting | Outdoor |
| Wood / finish | Solid wood construction; species and finish confirmed from project requirements |
| Heater | Wood stove route; flue and clearance confirmed by market |
| MOQ | 1 set |
| Quotation basis | Selected configuration, heater route, destination, packing, and project requirements confirmed before quotation |
| Reference | CSauna factory catalog record |
| Confirmation items | Dimensions, packing, material details, and order drawings are confirmed before production. |
Use CSA-199 as the visual model reference. Final size, bench layout, heater, glass, voltage, packing, and document route are locked after the approved drawing.
Known vs. confirm before production
| Recorded for review | Model title, model code, MOQ reference, price band, product type, and image set. |
|---|---|
| Confirm with buyer | Final dimensions, material grade, heater option, glass/door direction, packing size, loading plan, labels, accessories, and destination requirements. |
| Approval step | CSauna confirms the final drawing, quotation, packing details, and order record before production starts. |
RFQ checklist for this model
- Target quantity and whether this is sample, distributor, or project order.
- Preferred size, wood/finish, heater type, voltage, and control option.
- Destination port or delivery country for freight and compliance review.
- Packaging, logo/private label, spare parts, and document requirements.
- Any site drawing, showroom reference, or installation constraint.
Model views for buyer review






Send us this model code
CSA-199 | bennett@csauna.com | WhatsApp / Phone: +86 180 7047 6405
Buyer-file detail
CSA-199 production, packing, and RFQ checks
CSA-199 should never be treated like an electric sauna with a small option change; stove, chimney, heat shield, and roof exit are the main buyer concerns.
The buyer should confirm whether CSauna supplies the stove and chimney or prepares the sauna for a local stove system.
Stove clearance, wall shield, bench distance, chimney route, roof protection, ash access, and warning labels should be recorded before production.
Wood species, exterior finish, roof material, door or glass direction, and lower-frame exposure should be approved with the same buyer file.
Factory QC should show stove wall area, roof exit preparation, bench layout, door or glass crate, stove package, chimney group, and carton labels.
Outdoor care notes should include ash handling, drying after use, lower-frame checks, roof inspection, fire-safety review, and first-season fastener checks.
The quotation should separate sauna shell, roof, door or glass, stove, chimney, heat shield, packing, warnings, documents, and spare hardware.
If the buyer changes stove supplier or local installer scope, chimney parts, warning labels, crate list, and manual language should be rewritten.
Repeat orders should lock wood finish, stove route, chimney scope, heat shield, roof package, warning labels, carton sequence, and spare fasteners.
This page should read like a real custom wood-fired project handoff instead of a generic outdoor sauna product.
Final buyer confirmation
Final approval for CSA-199 should include stove supply scope, chimney route, heat shield, roof exit, warning labels, and local installer responsibility.
Packing evidence should show stove package, chimney group, roof parts, door or glass crate, bench boards, wall parts, and hardware bags.
If the buyer supplies the stove locally, that exclusion should be written into the quotation and order file.
Outdoor maintenance guidance should include ash removal, roof inspection, drying, and first-season checks.
The service file should include stove model if supplied, chimney references, warning labels, fasteners, and replacement door or glass references.
Repeat production should match the approved fire-safety route before loading.
Production record
CSA-199 should keep stove supply scope, chimney route, heat shield, roof exit, warning labels, local installer responsibility, and spare fastener references in one fire-route file.
Before repeat loading, CSauna should compare stove wall area, roof exit preparation, chimney group, door or glass crate, labels, manuals, and outdoor safety notes.