
Specifications and options for CSA-269
Use CSA-269 as the visual reference, then confirm capacity, size, heater voltage, wood finish, glass direction, MOQ, packing, and document needs before quotation.
| Model / SKU | CSA-269 |
|---|---|
| Product type | Outdoor sauna |
| Wood / finish | Solid wood construction; species and finish confirmed from project requirements |
| MOQ | 1 set |
| Quotation basis | Selected configuration, heater route, destination, packing, and project requirements confirmed before quotation |
| Reference | CSauna factory catalog record |
| Confirmation items | Dimensions, packing, material details, and order drawings are confirmed before production. |
Use CSA-269 as the visual model reference. Final size, bench layout, heater, glass, voltage, packing, and document route are locked after the approved drawing.
Known vs. confirm before production
| Recorded for review | Model title, model code, MOQ reference, price band, product type, and image set. |
|---|---|
| Confirm with buyer | Final dimensions, material grade, heater option, glass/door direction, packing size, loading plan, labels, accessories, and destination requirements. |
| Approval step | CSauna confirms the final drawing, quotation, packing details, and order record before production starts. |
RFQ checklist for this model
- Target quantity and whether this is sample, distributor, or project order.
- Preferred size, wood/finish, heater type, voltage, and control option.
- Destination port or delivery country for freight and compliance review.
- Packaging, logo/private label, spare parts, and document requirements.
- Any site drawing, showroom reference, or installation constraint.
Model views for buyer review






Send us this model code
CSA-269 | bennett@csauna.com | WhatsApp / Phone: +86 180 7047 6405
Production confirmation
What CSauna checks before CSA-269 is quoted
CSA-269 should be written around lakeside exposure and the integrated deck, because those details affect both design and maintenance.
The buyer should confirm whether the deck is for cooling down, towels, shoes, lounge access, or guest waiting.
Water-side locations need stronger notes for exterior finish, drying, roof inspection, base support, and deck maintenance.
Glass direction, deck depth, entrance side, bench layout, heater wall, ventilation, and controller route should be approved together.
Heater kW should be checked against room volume, glass area, and colder lakeside conditions.
Voltage label, controller note, manual warning, and local electrician responsibility should match the destination market.
MOQ, carton dimensions, CBM, loading method, destination port, and unloading access should be visible before quote comparison.
Packing evidence should show deck modules, pod panels, glass crate, roof pack, heater package, controller, labels, and carton marks.
If deck depth changes, floor pack, crate length, roof edge, installation sequence, and loading plan should change together.
For resorts, CSauna should attach maintenance notes for deck boards, exterior finish, glass cleaning, ventilation drying, and spare hardware.
Private-label buyers should approve model code, labels, manual version, carton artwork, and warranty card.
Repeat orders should lock pod footprint, deck depth, glass side, heater route, voltage label, and spare part names.
Final buyer confirmation
Final approval should include deck depth, lakeside exposure, glass side, heater kW, voltage market, roof route, and carton marks.
Packing evidence should separate deck modules from pod panels and glass crate.
If foundation is buyer-supplied, that responsibility should be written into the quote.
Service files should name deck boards, glass, heater stones, controller, guard, roof trim, and base fasteners.
Maintenance notes should cover water-side drying, deck care, exterior finish, and ventilation.
Repeat production should compare deck depth and glass direction against approved photos.
Buyer-file completion
CSA-269 final production details
Before CSA-269 is approved, the buyer should decide whether the deck is supplied as a fixed integrated platform or a separate module for local positioning.
The lakeside file should include deck depth, water-side exposure, foundation responsibility, roof edge, glass direction, heater route, voltage label, and drying guidance.
Packing should identify deck modules separately from pod panels, glass crate, heater carton, controller, stones, roof parts, labels, and spare hardware.